Liminal Containment Sciences Division

Site Recovery Services

Contractor terms

Site Recovery Services contracts crews of 4 contractors to recover Sector 7 sites. Clearances, rates and locker prices are as follows.

Document
CC-TERMS
Authority
Liminal — Site Recovery Services
Class
CONTRACTOR

Clearance

The window is the number of rounds before extraction closes. Work per site is the work a site takes to recover.

ClearanceBriefWindowWork per sitePayout
STANDARD CLEARANCEROUTINE. THE FACILITY IS QUIET AND THE DOOR STAYS OPEN.10 rounds3100%
DEEP CLEARANCETHE CONTAMINATION IS OLDER. SOMETHING ELSE IS DOWN THERE.9 rounds4150%
BLACK CLEARANCENOBODY WILL CONFIRM WHAT IS IN THERE. THE WINDOW IS SIX ROUNDS.6 rounds5220%

Rates

Extraction400 C
Each site recovered200 C
All sites on the contract recovered100 C
Replacement contractor300 C

Locker

Locker equipment is bought by the company holding the contract.

ItemNotesCost
PRY BARNever runs out. Worse than the torch at everything else.600 C
CONTRACT INTELOne more round on the extraction window per rank.800 / 1,600 / 2,800 C
ARC WELDERLight that lasts, at the price of light that reaches.1,400 C
DECONTAMINATION SPRAYERTwo points of work an action. Close to useless in a fight.2,000 C

Descent

FloorBrief
ADMINISTRATIONTHE FLOOR WITH THE RECEPTION DESK ON IT.
LABORATORY TIERSTILL SIGNPOSTED. STILL THE PART THEY SHOW PEOPLE.
ARCHIVE TIERTHE EXPANSION NOBODY SIGNED OFF. THE SIGNAL STOPS BEING CLEAN HERE.
SUBLEVEL WORKSCUT BY WHOEVER WAS AVAILABLE, AROUND WHATEVER WAS ALREADY THERE.
CONTAINMENT RINGTHE ORIGINAL BUILD. EVERYTHING ABOVE THIS WAS PUT HERE TO REACH IT.

Debrief

Each contractor is returned in the debrief as OUT, DOWN or LEFT INSIDE.

Names are withheld before a debrief leaves Site Recovery Services.